Dynamic multi-mode resource-constrained multi-project scheduling problem with weighted earliness and tardiness: a real-life boutique furniture implementation

Yıl: 2022 Cilt: 10 Sayı: 3 Sayfa Aralığı: 1095 - 1117 Metin Dili: İngilizce DOI: 10.15295/bmij.v10i3.2111 İndeks Tarihi: 25-10-2022

Dynamic multi-mode resource-constrained multi-project scheduling problem with weighted earliness and tardiness: a real-life boutique furniture implementation

Öz:
Real-life project scheduling environments are often dynamic and subject to disruption. Early or late completion of interrupted projects can create costs for the business. At the same time, there is an alternative to producing multiple projects at multiple different costs. In this study, a new mixed integer linear programming model that minimizes the sum of weighted earliness and tardiness penalties and mode selection costs is proposed to solve the real-life problem faced by a boutique furniture company. A proposed dynamic model also considers the cost of deviation from the baseline schedule in case disruption scenarios corrupt the resulting baseline schedule. The problems are solved with the CPLEX solver using the GAMS program. The results show that the interruption scenarios partially change the baseline schedule and increase the total cost. In case of more than one int erruption in the same schedule, the number of late completed activities and their delay times increased.
Anahtar Kelime:

Ağırlıklı erken ve geç bitirmeli dinamik çok modlu kaynak kısıtlı çoklu proje çizelgeleme problemi: bir gerçek hayat butik mobilya uygulaması

Öz:
Gerçek hayat proje çizelgeleme ortamları genelde dinamiktir ve kesintiye uğrama olasılığı vardır. Kesintiye uğrayan projelerin erken bitirilme yada geç bitirilme durumları işletmeye maliyet oluşturabilir. Aynı zamanda birden çok projeyi birden çok farklı maliyetle üretme alternatifi vardır. Bu çalışmada butik bir mobilya firmasının karşılaştığı gerçek hayat problemini çözmek için ağırlıklı erken ve geç bitirme cezaları ile mod seçim maliyetleri toplamını en aza indiren yeni bir karma tamsayılı doğrusal programlama modeli önerilmektedir. Elde edilen temel çizelgenin kesinti senaryolarıyla bozulması durumunda temel çizelgeden sapmanın maliyetini de hesaba katan dinamik bir model önerilmiştir. Problemler GAMS programı kullanılarak CPLEX çözücü ile çözülmüştür. Elde edilen sonuçlar kesinti senaryolarının temel çizelgeyi kısmen değiştirdiğini ve toplam maliyeti artırdığını göstermiştir. Aynı çizelgede birden fazla kesinti olması durumunda ise geç tamamlanan faaliyetlerin sayısı ve gecikme süreleri artmıştır.
Anahtar Kelime:

Belge Türü: Makale Makale Türü: Araştırma Makalesi Erişim Türü: Erişime Açık
  • Afshar-Nadjafi, B., Basati, M., & Maghsoudlou, H., (2017). “Project scheduling for minimizing temporary availability cost of rental resources and tardiness penalty of activities”. Applied Soft Computing Journal, Vol. 61, 536–548. https://doi.org/10.1016/j.asoc.2017.08.033
  • Afshar-Nadjafi, B., & Shadrokh, S., (2008). "An algorithm for the weighted earliness-tardiness unconstrained project scheduling problem". Journal of Applied Sciences, Vol. 8 (9), 1651–1659. https://doi.org/10.3923/jas.2008.1651.1659
  • Aouam, T., & Vanhoucke, M., (2019). "An agency perspective for multi-mode project scheduling with time/cost trade-offs". Computers and Operations Research, Vol. 105, 167–186. https://doi.org/10.1016/j.cor.2019.01.012
  • Aytug, H., Lawley, M.A., McKay, K., Mohan, S., & Uzsoy, R., (2005). "Executing production schedules in the face of uncertainties: A review and some future directions". European Journal of Operational Research. Vol. 161, 86-110. https://doi.org/10.1016/j.ejor.2003.08.027
  • Bold, M., & Goerigk, M., (2021). "A compact reformulation of the two-stage robust resource-constrained project scheduling problem". Computers and Operations Research, Vol. 130, 105232. https://doi.org/10.1016/j.cor.2021.105232
  • Bozorgirad, M. A., & Logendran, R., (2012). "Sequence-dependent group scheduling problem on unrelated-parallel machines". Expert Systems with Applications, Vol. 39 (10), 9021–9030. https://doi.org/10.1016/j.eswa.2012.02.032
  • Burgelman, J., & Vanhoucke, M., (2018). "Maximising the weighted number of activity execution modes in project planning". European Journal of Operational Research. Vol. 270 (3), 999–1013. https://doi.org/10.1016/j.ejor.2018.04.035
  • Capa C., & Ulusoy, G., (2015). "Proactive project scheduling in an R&D department a bi-objective genetic algorithm". 2015 International Conference on Industrial Engineering and Operations Management (IEOM), 1-6, doi: 10.1109/IEOM.2015.7093733.
  • Chakrabortty, R.K., Rahman, H.F., & Ryan, M.J., (2020). "Efficient priority rules for project scheduling under dynamic environments: A heuristic approach". Computers and Industrial Engineering.140, 106287. https://doi.org/10.1016/j.cie.2020.106287
  • Chakrabortty, R.K., Rahman, H.F., Haque, K.M.A., Paul, S.K., & Ryan, M.J., (2021). "An event-based reactive scheduling approach for the resource constrained project scheduling problem with unreliable resources". Computers and Industrial Engineering. Vol. 151, 106981. https://doi.org/10.1016/j.cie.2020.106981
  • Chakrabortty, R.K., Sarker, R.A., & Essam, D.L., (2016). "Multi-mode resource-constrained project scheduling under resource disruptions". Computers and Chemical Engineering. Vol. 88, 13–29. https://doi.org/10.1016/j.compchemeng.2016.01.004
  • Chakrabortty, R.K., Sarker, R.A., & Essam, D.L., (2018). "Single mode resource-constrained project scheduling with unreliable resources". Operational Research. 1–35. https://doi.org/10.1007/s12351- 018-0380-7
  • Changchun, L., Xi, X., Canrong, Z., Qiang, W., & Li, Z., (2018). "A column generation based distributed scheduling algorithm for multi-mode resource-constrained project scheduling problem". Computers and Industrial Engineering. Vol. 125(September), 258–278. https://doi.org/10.1016/j.cie.2018.08.036
  • Cheng, J., Fowler, J., Kempf, K., & Mason, S., (2015). "Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting". Computers and Operations Research. Vol. 53, 275-287. http://dx.doi.org/10.1016/j.cor.2014.04.018
  • Chtourou, H., & Haouari, M., (2008). "A two-stage-priority-rule-based algorithm for robust resource- constrained project scheduling". Computers and Industrial Engineering. Vol. 55 (1), 183–194. https://doi.org/10.1016/j.cie.2007.11.017
  • Collyer, S., (2015). Managing amidst rapid change : management approaches for dynamic environments. Project Management Institute. Inc. Retrieved from https://books.google.co.uk/books/about/Managing_Amidst_Rapid_Change.html?id=g_KuDgA AQBAJ&printsec=frontcover&source=kp_read_button&redir_esc=y#v=onepage&q&f=false
  • Da Silva, A.R.V., & Ochi, L.S., (2010). Hybrid heuristics for dynamic resource-constrained project scheduling problem. Lecture Notes in Computer Science (Including Subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics), 6373 LNCS, 73–87. https://doi.org/10.1007/978-3-642-16054-7_6
  • Da Silva, A.R.V., Ochi, L.S., & Santos, H.G., (2008). "New effective algorithm for dynamic resource- constrained project scheduling problem". EngOpt 2008 - International Conference on Engineering Optimization. Rio de Janeiro, Brazil, 01 - 05 June 2008.
  • Damay, J., Quilliot, A., & Sanlaville, E., (2007). "Linear programming based algorithms for preemptive and non-preemptive RCPSP". European Journal of Operational Research. Vol. 182 (3), 1012–1022. https://doi.org/10.1016/j.ejor.2006.09.052
  • Davari, M., & Demeulemeester, E., (2017). " The proactive and reactive resource-constrained project scheduling problem: the crucial role of buffer-based reactions". KU Leuven, Faculty of Economics and Business, KBI_1707. http://dx.doi.org/10.2139/ssrn.2976350
  • Davari, M., & Demeulemeester, E., (2018). "Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem". Annals of Operations Research, 1–24. https://doi.org/10.1007/s10479-018-2899-7
  • Deblaere, F., Demeulemeester, E., & Herroelen, W., (2011). "Reactive scheduling in the multi-mode RCPSP". Computers and Operations Research. Vol. 38 (1), 63–74. https://doi.org/10.1016/j.cor.2010.01.001
  • Golestaneh, R., Jafari, A., Khalilzadeh, M., & Karimi, H., (2013). "Minimizing total resource tardiness penalty costs in the resource-constrained project scheduling problem with metaheuristic algorithms". International Journal of Research in Industrial Engineering, Vol. 2(3), 47-57.
  • Gonçalves, J.F., Mendes, J.J.M., & Resende, M.G.C., (2015). The basic multi-project scheduling problem. In Handbook on Project Management and Scheduling Vol. 2 (pp. 667–683). Springer International Publishing.
  • Hartmann, S., & Briskorn, D., (2010). "A survey of variants and extensions of the resource-constrained project scheduling problem". European Journal of Operational Research. Vol. 207 (1), 1–14. https://doi.org/10.1016/j.ejor.2009.11.005
  • Hauder, V.A., Beham, A., Raggl, S., Parragh, S.N., & Affenzeller, M., (2020). "Resource-constrained multi-project scheduling with activity and time flexibility". Computers and Industrial Engineering. Vol. 150, 106857. https://doi.org/10.1016/j.cie.2020.106857
  • Hazır, Ö., & Ulusoy, G., (2020). "A classification and review of approaches and methods for modeling uncertainty in projects". International Journal of Production Economics, Vol. 223, 107522, ISSN 0925- 5273, https://doi.org/10.1016/j.ijpe.2019.107522.
  • He, N., Z. Zhang, D., & Yuce, B., (2022) "Integrated multi-project planning and scheduling - a multiagent approach", European Journal of Operational Research, Vol. 302, 2, 688-699, ISSN 0377-2217, https://doi.org/10.1016/j.ejor.2022.01.018.
  • Herroelen, W., & Leus, R., (2005). "Project scheduling under uncertainty: survey and research potentials". European Journal of Operational Research. Vol. 165, 289-306.
  • Joo, B. J., Chua, T. J., Cai, T. X., & Chua, P. C., (2019). "Coordination-based reactive resource-constrained project scheduling". Procedia CIRP. Vol. 81, 51–56. https://doi.org/10.1016/j.procir.2019.03.010
  • Kéri, A., & Kis, T., (2006) Primal-dual combined with constraint propagation for solving RCPSPWET. In: Haasis HD., Kopfer H., Schönberger J. (eds) Operations Research Proceedings 2005. Operations Research Proceedings, vol 2005. Springer, Berlin, Heidelberg . https://doi.org/10.1007/3-540-32539- 5_107
  • Khoshjahan, Y., Najafi, A.A., & Afshar-Nadjafi, B., (2013). "Resource-constrained project scheduling problem with discounted earliness-tardiness penalties: Mathematical modeling and solving procedure". Computers and Industrial Engineering. Vol. 66 (2), 293–300. https://doi.org/10.1016/j.cie.2013.06.017
  • Kolisch, R., Sprecher, A., & Drexl, A., (1995). "Characterization and generation of a general class of resource-constrained project scheduling problems". Management Science. Vol. 41 (10), 1693–1703. https://doi.org/10.1287/mnsc.41.10.1693
  • Koné, O., Artigues, C., Lopez, P., & Mongeau, M., (2011). "Event-based MILP models for resource- constrained project scheduling problems". Computers and Operations Research. Vol. 38, 3–13. https://doi.org/10.1016/j.cor.2012.10.018
  • Kreter, S., Rieck, J., & Zimmermann, J., (2016). "Models and solution procedures for the resource- constrained project scheduling problem with general temporal constraints and calendars". European Journal of Operational Research. Vol. 251 (2), 387–403. https://doi.org/10.1016/j.ejor.2015.11.021
  • Krüger, D., & Scholl, A., (2009). "A heuristic solution framework for the resource-constrained (multi- )project scheduling problem with sequence-dependent transfer times". European Journal of Operational Research. Vol. 197 (2), 492–508. https://doi.org/10.1016/j.ejor.2008.07.036
  • Kurt P.A., & Kececi B. (2019) Resource Constrained Multi-project Scheduling: Application in Software Company. In: Karwowski W., Trzcielinski S., Mrugalska B., Di Nicolantonio M., Rossi E. (eds) Advances in Manufacturing, Production Management and Process Control. AHFE 2018. Advances in Intelligent Systems and Computing, Vol 793. Springer, Cham. https://doi.org/10.1007/978-3- 319-94196-7_51
  • Larsen, A., & Madsen, O.B.G., (2000). The dynamic vehicle routing problem. Kgs. Lyngby, Denmark: Technical University of Denmark (DTU). (IMM-PHD; No. 2000-73).
  • Larsen A., Madsen O.B.G., & Solomon M.M., (2007). Classification of dynamic vehicle routing systems. In: Zeimpekis V., Tarantilis C.D., Giaglis G.M., Minis I. (eds) Dynamic Fleet Management. Operations Research/Computer Science Interfaces Series, Vol 38. Springer, Boston, MA. https://doi.org/10.1007/978-0-387-71722-7_2
  • Ma, Z., Demeulemeester, E., He, Z., & Wang, N., (2019). "A computational experiment to explore better robustness measures for project scheduling under two types of uncertain environments". Computers and Industrial Engineering, 1–28. https://doi.org/10.1016/j.cie.2019.04.014
  • Oztemel, E., & Selam, A.A., (2017). "Bees Algorithm for multi-mode, resource-constrained project scheduling in molding industry". Computers and Industrial Engineering, Vol. 112, 187-196. http://dx.doi.org/10.1016/j.cie.2017.08.012
  • Pamay, M.B., (2011). A linear programming based method for the resource-constrained multi-project scheduling problem with weighted earliness/tardiness costs. [MSc dissertation]. The University of Sabancı, Istanbul.
  • Rahman, H.F., Chakrabortty, R.K., & Ryan, M.J., (2021). "Scheduling project with stochastic durations and time-varying resource requests: A metaheuristic approach". Computers and Industrial Engineering, Vol. 157, 107363. https://doi.org/10.1016/j.cie.2021.107363
  • Ruhlusaraç, M., (2020). Dynamic multi-mode resource-constrained multi-project scheduling with weighted earliness and tardiness and its application. [PhD dissertation]. The University of Erciyes, Kayseri.
  • Ruhlusaraç, M., & Çalışkan, F., (2018). Multi-mode resource-constrained multi-project scheduling problem with weighted earliness and tardiness. 9th International Science and Technology Conference. July 18-20, 2018 Paris, France, 60-64.
  • Ruhlusaraç, M., & Çalışkan, F., (2020). "A mathematical model for dynamic project scheduling problem and reactive scheduling implementation". Business & Management Studies: An International Journal. Vol. 8 (4), 83-97. https://doi.org/10.15295/bmij.v8i4.1708
  • Sabuncuoglu, I., & Bayiz, M., (2000). "Analysis of reactive scheduling problems in a job shop environment". European Journal of Operational Research. Vol. 126 (3), 567–586. https://doi.org/10.1016/S0377-2217(99)00311-2
  • Saif, U., Yue, L., & Awadh, M. A., (2022). "Coordinated Planning and Scheduling of Multiple Projects With New Projects Arrival Under Resource Constraint Using Drum Buffer Rope Heuristic", IEEE Access, Vol. 10, 84244-84266, https://doi.org/10.1109/ACCESS.2022.3195045.
  • Salemi Parizi, M., Gocgun, Y., & Ghate, A., (2017). "Approximate policy iteration for dynamic resource- constrained project scheduling". Operations Research Letters. Vol. 45 (5), 442–447. https://doi.org/10.1016/j.orl.2017.06.002
  • Schwindt C., (2000). Minimizing earliness-tardiness costs of resource-constrained projects. In: Inderfurth K., Schwödiauer G., Domschke W., Juhnke F., Kleinschmidt P., Wäscher G. (eds)
  • Operations Research Proceedings 1999. Operations Research Proceedings 1999 (Selected Papers of the Symposium on Operations Research (SOR' 99) Magdeburg, September 1 –3, 1999), vol 1999. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-58300-1_62
  • Song, W., Xi, H., Kang, D., & Zhang, J., (2018). "Simulation modelling practice and theory an agent- based simulation system for multi-project scheduling under uncertainty". Simulation Modelling Practice and Theory. 86(November 2017), 187–203. https://doi.org/10.1016/j.simpat.2018.05.009
  • Su, C.T., Santoro, M.C., & Mendes, A.B., (2018). "Constructive heuristics for project scheduling resource availability cost problem with tardiness". Journal of Construction Engineering and Management, Vol. 144 (8). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001524.
  • Tao, S., & Dong, Z.S., (2018). "Multi-mode resource-constrained project scheduling problem with alternative project structures". Computers and Industrial Engineering, Vol. 125, 333–347. https://doi.org/10.1016/j.cie.2018.08.027
  • Ulusoy, G., Hazır, Ö., (2021). An introduction to project modeling and planning, Springer Texts in Business and Economics, https://doi.org/10.1007/978-3-030-61423-2.
  • Van de Vonder, S., (2006). "Proactive-reactive procedures for robust project scheduling". Applied Economics, (247), 239.
  • Van de Vonder, S., Ballestín, F., Demeulemeester, E., & Herroelen, W., (2007a). "Heuristic procedures for reactive project scheduling". Computers and Industrial Engineering. Vol. 52 (1), 11–28. https://doi.org/10.1016/j.cie.2006.10.002
  • Van de Vonder, S., Demeulemeester, E., & Herroelen, W., (2008). "Proactive heuristic procedures for robust project scheduling: an experimental analysis". European Journal of Operational Research. 189 (3), 723–733. https://doi.org/10.1016/j.ejor.2006.10.061
  • Van de Vonder, S., Demeulemeester, E., & Herroelen, W., (2007b). "A classification of predictive-reactive project scheduling procedures". Journal of Scheduling. Vol. 10 (3), 195–207. https://doi.org/10.1007/s10951-007-0011-2
  • Van Peteghem, V., & Vanhoucke, M., (2014). "An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances". European Journal of Operational Research. Vol. 235 (1), 62–72. https://doi.org/10.1016/j.ejor.2013.10.012
  • Vanhoucke, M., Demeulemeester, E., Herroelen, W., (2001). "An exact procedure for the resource- constrained weighted earliness – tardiness project scheduling". Annals of Operations Research. Vol. 102, 179–196. https://doi.org/10.1023/A:1010958200070
  • Voß, S., & Witt, A., (2007). "Hybrid flow shop scheduling as a multi-mode multi-project scheduling problem with batching requirements : a real-world application". Int. J. Production Economics. Vol. 105, 445–458. https://doi.org/10.1016/j.ijpe.2004.05.029
  • Wang, H., Lappas, N. H., & Gounaris, C., (2019). "Multi-mode resource-constrained project scheduling with alternative prerequisites : new models and computational studies". Industrial & Engineering Chemistry Research. 1–35. https://doi.org/10.1021/acs.iecr.9b02455
  • Wang, W., Ge, X., Li, L., & Su, J., (2019). "Proactive and reactive multi-project scheduling in uncertain environment". IEEE Access. Vol. 7, 88986–88997. https://doi.org/10.1109/access.2019.2926337
  • Watermeyer, K., & Zimmermann, J., (2020). "A branch-and-bound procedure for the resource- constrained project scheduling problem with partially renewable resources and general temporal constraints". OR Spectrum. Vol. 42, 427-460. https://doi.org/10.1007/s00291-020-00583-z
  • Yassine, A.A., Mostafa, O., & Browning, T.R., (2017). "Scheduling multiple, resource-constrained, iterative, product development projects with genetic algorithms". Computers and Industrial Engineering. Vol. 107, 39-56, ISSN 0360-8352, https://doi.org/10.1016/j.cie.2017.03.001.
  • Yuan, Y., Ye, S., Lin, L., & Gen, M., (2021). "Multi-objective multi-mode resource-constrained project scheduling with fuzzy activity durations in prefabricated building construction". Computers and Industrial Engineering, doi: https://doi.org/10.1016/j.cie.2021.107316
  • Zhang, Y., Hu, X., Cao, X., & Wu, C., (2022). "An efficient hybrid integer and categorical particle swarm optimization algorithm for the multi-mode multi-project inverse scheduling problem in turbine assembly workshop". Computers & Industrial Engineering. Vol. 169, 108148, ISSN 0360-8352, https://doi.org/10.1016/j.cie.2022.108148.
  • Zhu, G., Bard, J. F., & Yu, G., (2005). "Disruption management for resource-constrained project scheduling". Journal of the Operational Research Society. Vol. 56, 365–381. https://doi.org/10.1057/palgrave.jors.2601860
APA RUHLUSARAÇ M, Çalışkan F (2022). Dynamic multi-mode resource-constrained multi-project scheduling problem with weighted earliness and tardiness: a real-life boutique furniture implementation. , 1095 - 1117. 10.15295/bmij.v10i3.2111
Chicago RUHLUSARAÇ MURAT,Çalışkan Filiz Dynamic multi-mode resource-constrained multi-project scheduling problem with weighted earliness and tardiness: a real-life boutique furniture implementation. (2022): 1095 - 1117. 10.15295/bmij.v10i3.2111
MLA RUHLUSARAÇ MURAT,Çalışkan Filiz Dynamic multi-mode resource-constrained multi-project scheduling problem with weighted earliness and tardiness: a real-life boutique furniture implementation. , 2022, ss.1095 - 1117. 10.15295/bmij.v10i3.2111
AMA RUHLUSARAÇ M,Çalışkan F Dynamic multi-mode resource-constrained multi-project scheduling problem with weighted earliness and tardiness: a real-life boutique furniture implementation. . 2022; 1095 - 1117. 10.15295/bmij.v10i3.2111
Vancouver RUHLUSARAÇ M,Çalışkan F Dynamic multi-mode resource-constrained multi-project scheduling problem with weighted earliness and tardiness: a real-life boutique furniture implementation. . 2022; 1095 - 1117. 10.15295/bmij.v10i3.2111
IEEE RUHLUSARAÇ M,Çalışkan F "Dynamic multi-mode resource-constrained multi-project scheduling problem with weighted earliness and tardiness: a real-life boutique furniture implementation." , ss.1095 - 1117, 2022. 10.15295/bmij.v10i3.2111
ISNAD RUHLUSARAÇ, MURAT - Çalışkan, Filiz. "Dynamic multi-mode resource-constrained multi-project scheduling problem with weighted earliness and tardiness: a real-life boutique furniture implementation". (2022), 1095-1117. https://doi.org/10.15295/bmij.v10i3.2111
APA RUHLUSARAÇ M, Çalışkan F (2022). Dynamic multi-mode resource-constrained multi-project scheduling problem with weighted earliness and tardiness: a real-life boutique furniture implementation. Business and Management Studies: An International Journal, 10(3), 1095 - 1117. 10.15295/bmij.v10i3.2111
Chicago RUHLUSARAÇ MURAT,Çalışkan Filiz Dynamic multi-mode resource-constrained multi-project scheduling problem with weighted earliness and tardiness: a real-life boutique furniture implementation. Business and Management Studies: An International Journal 10, no.3 (2022): 1095 - 1117. 10.15295/bmij.v10i3.2111
MLA RUHLUSARAÇ MURAT,Çalışkan Filiz Dynamic multi-mode resource-constrained multi-project scheduling problem with weighted earliness and tardiness: a real-life boutique furniture implementation. Business and Management Studies: An International Journal, vol.10, no.3, 2022, ss.1095 - 1117. 10.15295/bmij.v10i3.2111
AMA RUHLUSARAÇ M,Çalışkan F Dynamic multi-mode resource-constrained multi-project scheduling problem with weighted earliness and tardiness: a real-life boutique furniture implementation. Business and Management Studies: An International Journal. 2022; 10(3): 1095 - 1117. 10.15295/bmij.v10i3.2111
Vancouver RUHLUSARAÇ M,Çalışkan F Dynamic multi-mode resource-constrained multi-project scheduling problem with weighted earliness and tardiness: a real-life boutique furniture implementation. Business and Management Studies: An International Journal. 2022; 10(3): 1095 - 1117. 10.15295/bmij.v10i3.2111
IEEE RUHLUSARAÇ M,Çalışkan F "Dynamic multi-mode resource-constrained multi-project scheduling problem with weighted earliness and tardiness: a real-life boutique furniture implementation." Business and Management Studies: An International Journal, 10, ss.1095 - 1117, 2022. 10.15295/bmij.v10i3.2111
ISNAD RUHLUSARAÇ, MURAT - Çalışkan, Filiz. "Dynamic multi-mode resource-constrained multi-project scheduling problem with weighted earliness and tardiness: a real-life boutique furniture implementation". Business and Management Studies: An International Journal 10/3 (2022), 1095-1117. https://doi.org/10.15295/bmij.v10i3.2111