Potential benefits of agile project management in improving construction project performances: A case study of Iraq

Öz:
Due to poor performances in construction projects, there is a necessity to apply novel project management approaches instead of traditional ones. Recently, although new project management methods have emerged and applied in different industries, the construction industry has stayed behind in implementing these techniques. The agile Project Management (APM) approach is one of these methods, and it has been highly discussed recently. As developing countries considerably suffer from poor performance in construction projects, applying new project management methods has gained more importance in these territories. Even though different studies attempted to understand the applicability of the APM, it is also necessary to explore the potential benefits of the agile methods for the construction industry. For this purpose, we surveyed 140 construction experts for the prioritization of factors and received responses on the potential advantages of the APM regarding team and project performance in construction. The results achieved from the Iraq field study demonstrate that the APM could be feasible for the construction industry and could effectively bring solutions to the project performance issues. We also concluded that the adverse effects of poor project performance, such as quality defects, schedule variances, cost overruns, and low productivity, could be eliminated especially in the construction industry of developing countries, through APM approaches.
Anahtar Kelime:

Belge Türü: Makale Makale Türü: Araştırma Makalesi Erişim Türü: Erişime Açık
  • [1] Le-Hoai L, Lee YD, Lee JY (2008) Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries. KSCE Journal of Civil Engineering 12:367–377. https://doi.org/10.1007/s12205-008-0367-7.
  • [2] Meng X (2012) The effect of relationship management on project performance in construction. International Journal of Project Management 30(2): 188-198. https://doi.org/10.1016/j.ijproman.2011.04.002.
  • [3] Babalola O, Item EO, Ezema IC (2019) Implementation of lean practices in the construction industry: A systematic review. Building and Environment 148: 34-43. https://doi.org/10.1016/j.buildenv.2018.10.051.
  • [4] Hire S, Sandbhor S, Ruikar K, Amarnath CB (2021) BIM usage benefits and challenges for site safety application in Indian construction sector. Asian Journal of Civil Engineering 22(7): 1-19. https://doi.org/10.1007/s42107-021-00379-8.
  • [5] Lai YT, Wang WC, Wang HH (2008) AHP- and simulation-based budget determination procedure for public building construction projects.
  • Automation in Construction 17(5): 623-632. https://doi.org/10.1016/j.autcon.2007.10.007.
  • [6] Arefazar Y, Nazari A, Hafezi MR, Maghool SAH (2022) Prioritizing agile project management strategies as a change management tool in construction projects. International Journal of Construction Management 22(4): 678-689. https://doi.org/10.1080/15623599.2019.1644757.
  • [7] Mpofu B, Ochieng EG, Moobela C, Pretorius A (2017) Profiling causative factors leading to construction project delays in the United Arab Emirates. Engineering, Construction and Architectural Management 24(2): 346-376. https://doi.org/10.1108/ECAM-05-2015-0072.
  • [8] Ahady S, Gupta S, Malik RK (2017) A critical review of the causes of cost overrun in construction industries in developing countries. International Research Journal of Engineering and Technology 4(3): 2550-2558.
  • [9] Al Hadithi BI. An investigation into factors causing delays in highway construction projects in Iraq. MATEC Web Conferences 2018. https://doi.org/10.1051/matecconf/201816202035.
  • [10] Waheeb RA, Andersen BS (2022) Causes of problems in post-disaster emergency re-construction projects—Iraq as a case study. Public Works Management & Policy 27(1): 61–97. https://doi.org/10.1177/1087724X21990034.
  • [11] Mohammed SR, Jasim AJ (2017) Study and analysis of the delay problems in Iraqi construction projects. International Journal of Science and Research 6(5): 2331–2336. https://doi.org/ 10.21275/ART20173791.
  • [12] Hass K (2007) The blending of traditional and agile project management. PM World Today 9(5): 1–6.
  • [13] Bergmann T, Karwowski W (2019) Agile project management and project success: A literature review, Advances in Intelligent Systems and Computing 783: 405-414. https://doi.org/10.1007/978-3-319-94709-9_39.
  • [14] Katumba B, Knauss E. Agile development in automotive software development: Challenges and opportunities. 15th International Conference, PROFES 2014, December 10-12, 2014, Helsinki, Finland. https://doi.org/10.1007/978-3-319-13835-0_3.
  • [15] Benedicenti L, Ciancarini P, Cotugno F, Messina A, Sillitti A, Succi G (2017) Improved Agile: a customized scrum process for project management in defense and security. Software Project Management for Distributed Computing pp 289–314. https://doi.org/10.1007/978-3-319-54325-3_12.
  • [16] Kitzmiller R, Hunt E, Sproat SB (2006) Adopting best practices: “Agility” moves from software development to healthcare project management. Computers, Informatics, Nursing 24(2): 75-82. https://doi.org/10.1097/00024665-200603000-00005.
  • [17] Conforto EC, Salum F, Amaral DC, Da Silva SL, De Almeida LFM (2014) Can agile project management be adopted by industries other than software development? Project Management Journal 45839: 21-34. https://doi.org/ 10.1002/pmj.21410
  • [18] Sakikhales MH, Stravoravdis S (2017) Using agile project management and BIM for improved building performance. Building Information Modelling, Building Performance, Design and Smart Construction pp. 65–78. https://doi.org/10.1007/978-3-319-50346-2_5.
  • [19] Sohi AJ, Hertogh M, Bosch-Rekveldt M, Blom R (2016) Does lean & agile project management help coping with project complexity? Procedia - Social and Behavioral Sciences 226: 252–259. https://doi.org/10.1016/j.sbspro.2016.06.186.
  • [20] Albuquerque F, Torres AS, Berssaneti FT (2020) Lean product development and agile project management in the construction industry. Revista de Gestão 27(2): 135-151. https://doi.org/10.1108/REGE-01-2019-0021.
  • [21] Owen R, Koskela L, Henrich G, Codinhoto R. Is agile project management applicable to construction 14th Annual Conference of the International Group for Lean Construction, 25-27 July 2006, Santiago, Chile.
  • [22] Ingle A (2019) Agile project management: Feasible methodology in construction industry. International Journal of Engineering and Advanced Technology 9(1): 5210-5213.
  • [23] Johansson YM. Agile project management in the construction industry. MSc Thesis, KTH, 2012.
  • [24] Kashikar A, Mehta D, Motichandani B, Chaitanya PD (2016) A case study on agile and lean project management in construction industry. IOSR Journal of Mechanical and Civil Engineering 13(4): 31-39.
  • [25] Sertyesilisik B (2014) Lean and agile construction project management: as a way of reducing environmental footprint of the construction industry. Intelligent Systems, Control and Automation: Science and Engineering 72: 179-196.
  • [26] Kasturiwale A, Rathod K (2021) Agile project management in construction industry. International Journal of Research in Engineering and Science 9(6): 9-11.
  • [27] Lewis TM. Quantifying the GDP–construction relationship. In: Economics for the Modern Built Environment, Routledge, 2008, pp. 26.
  • [28] Assaf SA, Al-Hejji S (2006) Causes of delay in large construction projects. International Journal of Project Management 24(4): 349–357.
  • [29] Kazaz A, Ulubeyli S, Tuncbilekli NA (2012) Causes of delays in construction projects in Turkey. Journal of Civil Engineering and Management 18(3): 426-435.
  • [30] Ofori G. Contemporary Issues In Construction In Developing Countries, Routledge, UK, 2011.
  • [31] Ezzat Othman AA (2013) Challenges of mega construction projects in developing countries. Organization, Technology and Management in Construction: an International Journal 5(1): 730-746.
  • [32] Yap JBH, Chow IN, Shavarebi K (2019) Criticality of construction industry problems in developing countries: analyzing Malaysian projects. Journal of Management in Engineering 35(5): 04019020.
  • [33] Radhi R, Halim R, Jamal M. Exploring building & construction in Iraq, 2021. https://kapita.iq/content/issue/building-and-construction-iraq.
  • [34] Khaleel T, Hadi Z (2017) Controlling of time-overrun in construction projects in Iraq. Engineering and Technology Journal 35(2): 111-117.
  • [35] Bekr GA (2015) Causes of delay in public construction projects in Iraq. Jordan Journal of Civil Engineering 9(2): 149-162.
  • [36] Irfan M, Zahoor H, Abbas M, Ali Y (2020) Determinants of labor productivity for building projects in Pakistan. Journal of Construction Engineering, Management & Innovation 3(2): 85-100.
  • [37] Mohammed SR, Jasim AJ (2018) Using agile construction management principles for reducing delay in Iraqi construction industry. Journal of Engineering Sciences 25(5): 151–170. https://www.ijol.edu.iq/index.php/auisseng/article/view/219.
  • [38] Mohammed SR, Jasim AJ (2018) Examining the values and principles of agile construction management in Iraqi construction projects. Journal of Engineering 24(7): 114-133.
  • [39] Ahmed GA, Altaie MR. Investigation the opportunity of BIM with agile management approach in Iraqi construction projects. E3S Web of Conferences, 2021, 318, 02001. https://doi.org/10.1051/e3sconf/202131802001.
  • [40] Bagaya O, Song J (2016) Empirical study of factors influencing schedule delays of public construction projects in Burkina Faso Journal of Management in Engineering 32(5): 05016014.
  • [41] Egwim CN, Alaka H, Toriola-Coker LO, Balogun H, Ajayi S, Oseghale R (2021) Extraction of underlying factors causing construction projects delay in Nigeria. Journal of Engineering, Design and Technology. https://doi.org/10.1108/JEDT-04-2021-0211.
  • [42] Cronbach LJ, Schönemann P, Mckie D (1965) Alpha coefficients for stratified-parallel tests. Educational and Psychological Measurement 25: 291–312.
APA Kazar G, Mansour A, Tokdemir O (2022). Potential benefits of agile project management in improving construction project performances: A case study of Iraq. , 64 - 76. 10.31462/jcemi.2022.02064076
Chicago Kazar Gokhan,Mansour Ahmed,Tokdemir Onur Behzat Potential benefits of agile project management in improving construction project performances: A case study of Iraq. (2022): 64 - 76. 10.31462/jcemi.2022.02064076
MLA Kazar Gokhan,Mansour Ahmed,Tokdemir Onur Behzat Potential benefits of agile project management in improving construction project performances: A case study of Iraq. , 2022, ss.64 - 76. 10.31462/jcemi.2022.02064076
AMA Kazar G,Mansour A,Tokdemir O Potential benefits of agile project management in improving construction project performances: A case study of Iraq. . 2022; 64 - 76. 10.31462/jcemi.2022.02064076
Vancouver Kazar G,Mansour A,Tokdemir O Potential benefits of agile project management in improving construction project performances: A case study of Iraq. . 2022; 64 - 76. 10.31462/jcemi.2022.02064076
IEEE Kazar G,Mansour A,Tokdemir O "Potential benefits of agile project management in improving construction project performances: A case study of Iraq." , ss.64 - 76, 2022. 10.31462/jcemi.2022.02064076
ISNAD Kazar, Gokhan vd. "Potential benefits of agile project management in improving construction project performances: A case study of Iraq". (2022), 64-76. https://doi.org/10.31462/jcemi.2022.02064076
APA Kazar G, Mansour A, Tokdemir O (2022). Potential benefits of agile project management in improving construction project performances: A case study of Iraq. Journal of Construction Engineering, Management & Innovation (Online), 5(2), 64 - 76. 10.31462/jcemi.2022.02064076
Chicago Kazar Gokhan,Mansour Ahmed,Tokdemir Onur Behzat Potential benefits of agile project management in improving construction project performances: A case study of Iraq. Journal of Construction Engineering, Management & Innovation (Online) 5, no.2 (2022): 64 - 76. 10.31462/jcemi.2022.02064076
MLA Kazar Gokhan,Mansour Ahmed,Tokdemir Onur Behzat Potential benefits of agile project management in improving construction project performances: A case study of Iraq. Journal of Construction Engineering, Management & Innovation (Online), vol.5, no.2, 2022, ss.64 - 76. 10.31462/jcemi.2022.02064076
AMA Kazar G,Mansour A,Tokdemir O Potential benefits of agile project management in improving construction project performances: A case study of Iraq. Journal of Construction Engineering, Management & Innovation (Online). 2022; 5(2): 64 - 76. 10.31462/jcemi.2022.02064076
Vancouver Kazar G,Mansour A,Tokdemir O Potential benefits of agile project management in improving construction project performances: A case study of Iraq. Journal of Construction Engineering, Management & Innovation (Online). 2022; 5(2): 64 - 76. 10.31462/jcemi.2022.02064076
IEEE Kazar G,Mansour A,Tokdemir O "Potential benefits of agile project management in improving construction project performances: A case study of Iraq." Journal of Construction Engineering, Management & Innovation (Online), 5, ss.64 - 76, 2022. 10.31462/jcemi.2022.02064076
ISNAD Kazar, Gokhan vd. "Potential benefits of agile project management in improving construction project performances: A case study of Iraq". Journal of Construction Engineering, Management & Innovation (Online) 5/2 (2022), 64-76. https://doi.org/10.31462/jcemi.2022.02064076